Cost Overrun word meaning and definition
Beside meaning and definition for phrase "cost overrun", on this page you can find other interesting information too, like synonyms or related words. On bottom of the page we have fun area, like tarot cards, numerology for these Eleven characters, how to write "cost overrun" with bar codes or hand signs and more.. Table of Contents:
• Letter statistic • Hand signs, morse code • Tarot cards, numerology • Other fun |
Do you like word(s) »cost overrun«? |
Meaning and definition for "cost overrun" phrase
See also: cost |
The fun area, different aproach to phrase »cost overrun«
Let's analyse "cost overrun" as pure text. This string has Eleven letters in Four syllables and Four vowels. 36.4% of vowels is 2.2% less then average English word. Written in backwards: NURREVO TSOC. Average typing speed for these characters is 3090 milliseconds. [info]
- -
Numerology Hearts desire number calculated from vowels:
cost overrun: 6 + 6 + 5 + 3 = 20, reduced: 2 . and the final result is Two. |
Tarot cards
|
Search internet for "cost overrun"
> Search images |
Page generated in 0.0159 seconds.